A horizontal ground loop uses shallow trenches and needs a lot of open land, while a vertical loop uses deep boreholes and needs little surface area but costs more per metre of access. The right choice usually comes down to lot size, soil, rock depth and what the contractor can reach.

Last updated

What are the types of geothermal ground loop?

Every geothermal system fits one of two families. A closed loop is a sealed circuit of plastic pipe that keeps the same water and antifreeze mix circulating, and heat exchange with the ground happens through the pipe wall. An open loop pumps water from a well or other source through the heat pump and returns it. Most homes use a closed loop, laid out in one of four ways:

  • Horizontal. Pipe in shallow trenches across open ground.
  • Vertical. U-shaped pipe in drilled boreholes.
  • Slinky. Overlapping coils laid in a trench, a variation of the horizontal design.
  • Pond or lake. Coils sunk in a suitable body of water.

Every closed design buries the same high-density polyethylene pipe, joined by heat fusion, and circulates the same fluid. The geothermal heat pump does not care which you pick. The site does.

When does a horizontal loop make sense?

A horizontal geothermal loop lays pipe in trenches below the local frost depth, often in several runs, and the pipe is installed horizontally across the yard. It fits rural and large suburban lots with open, diggable soil and room for trenches that stay clear of trees, septic fields and buried services. Excavation equipment is easier to find than a drill rig, so the installation cost can be lower per unit of loop. Horizontal loops require more land because the pipe is spread out, and shallow ground swings with the seasons: shallow ground follows the air temperature more closely, so loop fluid can run colder late in winter than it would from deeper ground.

Wet clay or sandy soils change how well the soil conducts heat, so the designer needs a soil description as well as a lot plan. Re-landscaping after trenching is part of the real installation cost.

What is a slinky loop?

A slinky loop coils the pipe like a stretched spring and lays the coils flat or on edge in a trench, so more pipe fits in a shorter run. That reduces trench length and land area, at the cost of more pipe and careful backfill, because soil must touch the coils to move heat. It makes a horizontal loop more compact and is not a different kind of system.

When does a vertical loop make sense?

A vertical loop system suits small urban lots, retrofits where gardens must survive, and sites where bedrock or poor soil makes trenching awkward. Because a vertical closed loop reaches depths where temperatures hardly move through the year, performance is steady, and there is no large trench to restore. The costs are a drilling contractor, a mobile rig on the property, and local rules about drilling and grouting that vary between municipalities and provinces. Ask the installer which authority needs to be notified. The cost reasoning behind this is in geothermal heat pump cost in Canada.

Each borehole holds a pipe loop, and grout fills the gap around the pipe so heat can flow between pipe and rock and so the hole does not link water zones. Borehole drilling and grouting are work for licensed drillers who follow the provincial groundwater rules.

How deep and how far apart?

Depth depends on the load and the rock, and sources outside Canada often quote it in feet: 30 m is about 100 feet deep. Vertical boreholes must be spaced so neighbouring holes do not rob each other of heat. For an ordinary house that usually means several metres between holes and a design that sizes total length from the heat load; the working details are in borehole depth and spacing. A storage project plays by different rules. Drake Landing packed 144 boreholes about 35 to 37 m deep at 2.25 m spacing into a field roughly 35 m across, because the goal was to hold heat in a compact block of ground instead of drawing steadily from it. The full layout is on the borehole thermal energy storage page.

What are pond loops and open loops?

A pond loop, also called a lake loop, sinks pipe coils to the bottom of a pond or lake, and it needs no drilling or trenching. Water carries heat well, and installation can be cheaper than drilling, but the water body must be deep and large enough, with permission to use it. Provincial environment or water authorities usually regulate work in a lake or watercourse, and the coils must be protected from damage, so a designer has to confirm the site.

An open loop uses groundwater directly. It requires good water quality, enough quantity and local approval, and the water must return to the ground or a permitted discharge in the way regulators allow. Poor water can foul the heat exchanger, and rules differ between provinces. The details are in open-loop ground water heat pumps.

How do the loop types compare?

  • Horizontal. Land: large and open. Main cost: excavation and restoration. Main limit: land and shallow ground temperatures.
  • Slinky. Land: medium. Main cost: more pipe and careful backfill. Main limit: trench quality.
  • Vertical. Land: small. Main cost: drilling. Main limit: rig access, rock and local rules.
  • Pond or lake. Land: next to water. Main cost: coils and protection. Main limit: the water body and approvals.
  • Open loop. Land: near a well. Main cost: wells and pumping. Main limit: water quality and regulation.

Cost ranking depends on the site, so rely on written quotes. For more on cold-weather behaviour and running cost compared with other options, see air source vs ground source.

What affects installation cost and efficiency?

The installation cost of a geothermal system follows the work needed on site: drilling or excavation, pipe length, restoration and the pump set. Efficiency follows the temperature of the fluid, which depends on loop size, soil or rock and the heat the home needs. A loop that is too short leaves the fluid colder in winter, so the heat pump uses more energy and the geothermal system may call on backup heat. In cooling mode, a loop that runs too warm has the same effect. A designer should show the sizing calculation, and the next two pages explain the working numbers: geothermal heat pump installation process and geothermal cooling in Canada.

What does the loop do for the next 30 years?

Whatever type goes in, the loop system is a long-lived piece of the property, and the choice has consequences. A horizontal field limits what can be built or planted above it. A vertical field has a small footprint but a hidden geometry that future owners should know about. In both cases the as-built drawing, the pipe diameter, the fluid type and the pressure test results belong in the house file.

Loop design also determines how the geothermal system behaves in year ten as well as year one. A loop sized with some margin lets the fluid stay warmer, which helps efficiency (see how ground source heat pumps work), and a tight design leaves little room for the ground to recover. Ask the designer to show the predicted lowest fluid temperature across a multi-year run, beyond the first winter. The installation requires licensed professionals, and provincial and municipal rules apply.

Quick answers

Is a vertical ground loop better than horizontal?

Vertical loops tend to give steadier temperatures and need little land, but cost more to drill. Horizontal loops can be cheaper where there is open ground.

How much land does a horizontal loop need?

Often several times the floor area of the house, depending on soil and loop design. The installer should size it from your heat load.

Can the loop be installed under an existing driveway or garden?

Vertical boreholes can usually be placed in small footprints around a property, while trenching disturbs the surface. Plan access and restoration with the installer before signing.

Is a pond loop or an open loop a good choice?

Only where the site allows it. A pond loop needs a suitable water body and permission, and an open loop needs good groundwater and regulatory approval, so most homes use a vertical or horizontal closed loop.

Where to verify

Programmes, rules and prices change. Before acting on anything you read here, check it at the source:

  • Natural Resources Canada: federal energy-efficiency and clean-energy pages: programme status, EnerGuide labels, technical background.
  • Your provincial or territorial energy ministry: current rebates, rules and programme intake dates.
  • Provincial regulator for drilling and groundwater: licensing and rules that apply to boreholes and loop fields.
  • A licensed professional in your province: sizing, safety and installation for your particular building; these guides are general background only.

dlsc.ca is an independent information site. It sells and installs nothing and gives no personal advice.